Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days

Product Details
Customization: Available
After-sales Service: Remote Instruction
Connection Form: Hot-Rolled Steel
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (23)
  • Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
  • Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
  • Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
  • Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
  • Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
  • Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
Find Similar Products
  • Overview
  • Company Profile
  • Overseas compnay
  • PATENTS
  • Product Description
  • Product Parameters
  • Processing workshop
  • Loading pictures
  • FAQ
Overview

Basic Info.

Feature
Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable
Install
Online Guidance
Delivery Time
25-60 Days
Application Fields
Steel Structure Supermarket/Hotel Building
Use
Metal Structure Aircraft/Airplane Maintenance
Material
Steel
Product Type
Poultry Farm
Type of Steel for Building Structure
H-Section Steel
Warranty
3 Years
Design Style
Modern
Transport Package
Packaged
Trademark
oss
Origin
China
Production Capacity
400000 Suqare Meters

Product Description

Company Profile

Since its inception in 2009, Anhui Oriental Steel Structure Co., Ltd. has dynamically positioned itself as a trailblazer and industry frontrunner in the realm of steel structures. Celebrated for its innovative vision and steadfast dedication to unparalleled quality, this esteemed company offers an extensive suite of services that encompasses the entire spectrum of the steel industry. From expertly managed steel trading to the meticulous design, crafting, and flawless installation of steel structures, Anhui Oriental embodies a paragon of industry excellence. By harnessing a state-of-the-art logistics distribution network, it flourishes as a fully integrated enterprise, continually elevating benchmarks of superior craftsmanship and setting new standards for the industry.

Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days


Overseas compnay

In 2015, Anhui Oriental Steel Structure Co., Ltd. embarked on an ambitious journey to broaden its global reach by setting up an overseas company in Russia. This strategic move marked a significant milestone, reinforcing its position as a formidable force on the international platform.
In 2017, the company took another leap forward in its global expansion strategy by penetrating Thailand's vibrant market. With the establishment of an overseas company, it embarked on an exciting new chapter of transformative growth.
In 2019, Anhui Oriental Steel Structure Co., Ltd. boldly entered the fast-emerging Cambodian market, establishing an overseas company. This move showcases the company's dynamic adaptability and its influential presence on the global stage.

PATENTS

In a landmark achievement in 2015, Anhui Oriental Steel Structure Co., Ltd. invented the renowned Steel Broken Bridge Profile patent, a groundbreaking solution that effectively resolved modern construction challenges.

Revolutionizing tool innovation in 2019, the Fly Wheel Type Adjustable Wrench was launched, dramatically transforming versatility and precision. This set an unmatched benchmark in technological advancement and ingenuity.
In 2019, the introduction of the Cutting Machine for Steel Structure Processing was a game-changer, significantly boosting operational efficiency and precision, thereby redefining the capabilities of steel processing.
The pioneering development in 2019 of the Collapsible Lift Plastic Steel Window brought forth ultimate convenience, combining extraordinary durability with modern user-friendly design.

In 2021, the creation of the Girder Clamp for Steel Structure Engineering was a landmark innovation, ensuring installations are more secure and reliable than ever before, fundamentally enhancing structural integrity.
The 2021 launch of Steel Structure Cutting Equipment signaled a new era in advanced steel processing by delivering unprecedented precision, a true testament to technological progress.
Anhui Oriental Steel Structure Co., Ltd. in 2021 introduced an Auxiliary Setting for Steel Structure Construction, optimizing workflows and dramatically enhancing overall construction efficiency and project timelines.

The groundbreaking 2022 introduction of the Surface Rust Removal Device revolutionized maintenance practices in steel structure processing, establishing a new industry benchmark for maintenance excellence.
The 2022 release of the Spray Painting Equipment for Steel Structure Processing dramatically elevated finish quality, ensuring that all projects meet exceptional aesthetic standards.
The 2022 launch of Cutting Devices for Steel Structures marked an advancement in technology, emphasizing precision and efficiency, further pushing the boundaries of steel structure processing capabilities.
The 2022 debut of the Transport Setup for Steel Structures revolutionized logistical operations, streamlining processes and significantly enhancing overall project delivery efficiency and speed.


Product Description

Introducing our distinguished and innovative steel structure warehouse—a pinnacle of contemporary engineering excellence. This marvel is intricately crafted with essential components such as the powerful steel beams, unwavering purlins, and steadfast columns. These components are meticulously designed to synergize seamlessly, enabling the entire structure to withstand significant loads effortlessly. With its unmatched durability and extraordinary resilience, you can rest assured that your investment is safeguarded, ensuring enduring reliability and tranquility for years to come.

Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days

Product Parameters

I Main steel frame
1. Steel structure frame Welded H steel Q235B/Q355B Painting/Hot-dip galvanized
2. Wall/Roof purlin C/Z steel Q235B Galvanized
II Bracing Part
1. Tie Rod 89/114/158 Q235B Painting/Hot-dip galvanized
2. Flexible Bracing 16/18/20 Q235B Painting/Hot-dip galvanized
3. Sag rod 20 Q235B Galvanized
4. Brace Rod 32 Q235B Galvanized
5. Knee-brace L50 Q235B Painting/Hot-dip galvanized
III Roof & Wall Part
1. Roof /Wall panel Steel sheet 0.326~0.7mm corrugated steel sheet
Insulated sandwich panel EPS, Glass wool/Rock wool/PU insulated
2. Roof/Wall trimming Ridge roof panel 0.4~0.5 mm steel sheet
Flashing 0.4~0.5 mm steel sheet
Gable wall trimming 0.4~0.5 mm steel sheet
Wall corner trimming 0.4~0.5 mm steel sheet
IV Window & Door part
1. Window PVC/Aluminum frame Single/double glazing (Fixed/sliding/swing)
2. Door Rolling/sliding door Automatic and manual method
V Accessories
1. Bolts Anchor bolts, High strength bolts, Galvanized bolts, Turnbuckle, shear stud
2. Gutter Steel sheet/galvanized/Stainless steel(304)
3. Downpipe PVC 110/160
4. Roof Ventilator 600 (Galvanized)
         


Processing workshop

Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days




Loading pictures

Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days
Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days


Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days

Crafting resilient and highly efficient steel structures for your diverse needs such as buildings, workshops, warehouses, and godowns requires a dedicated focus on precision and a wealth of detailed information, including:
1). A thorough overview of your desired steel building specifications (key dimensions like length, width, accompanied by the crucial height specification, which plays a significant role in determining the overall cost).
2). Defining the specific use for your steel building (whether it's a factory, workshop, warehouse, hangar, plant, or even a modern poultry farm shed).
3). Elaborate on thermal requirements for optimized comfort and operational efficiency in your steel building (offering advanced insulation solutions such as EPS, glass wool, rock wool, and PU to meet your unique thermal needs).
4). Detailed specifics on lighting requirements for your steel building (with customized solutions for ventilation and skylight integration to match your precise lighting needs).
5). Specifications for windows and doors (providing a diverse selection including roll-up doors, sliding doors, steel doors, and PVC doors to seamlessly blend with your design aesthetic).
6). Considerations for critical wind and snow load factors inherent to your steel building (vital for engineering a structure that stands resilient against varying and challenging climatic conditions).
7). Specification of crane capacity requirements for operational efficiency within the steel building (offering varied crane capacities of 3, 5, 10, and 15 tons to perfectly match your operational specifications).


FAQ

Q: What should you provide before the quotation?
A: Please send your design drawings, or sketches to us and tell us the materials you want to use. If you do not have the drawings, just inform us of more data about the steel building you need, like the building's total area, detail dimension, floor amount, roof load, wind load, etc. from all of your requests. If you can make a hand draft, that would be great and helpful for us to get your idea.

1. Project Dimension

Width__________meters, Length________meters, Height__________meters
Steel Structure Parking Lot for Metal Aircraft Maintenance - 25-60 Days

2. Roof Slop Grade___________
3. Wall Panel: Fiber Cement Board, Thickness:___________
4. Wall Decoration: Cement Cladding, Metal Cladding, PVC Cladding, etc.
5. Roof Panel: EPS / PU / Rockwool Sandwich Panel, Thickness:__________________
6. Roof Decoration: Asphalt Single / Resin Tile / Metal Tile.
7. Door: 1)Aluminium Sliding Door 2) Steel Door 3) Roll Up Door(garage), Size:________
8. Window: 1)Aluminium Window 2)PVC Window, Size:______________
9. Draining: 1)Natural draining 2)Gutter+Downspout.


After choosing us
(1)We will offer a Proforma Invoice(PI) for you.
(2)We can arrange the shipment if necessary, because we have a close relationship with some shipping company.
(3)We can accept the third party to check the goods before delivery.
(4)We will ensure on-time delivery.
(5)We will give feedback in every stage of production.
(6)We have a skillful load team that loads containers nicely.
(7)We will offer detailed installation drawings in English to guide the on-site assembly work.
(8)If necessary, we can send engineers on-site to guide the installation.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier